TNIQ by Ringer
One command center for every number you manage.
Porting, toll-free, 10DLC messaging, and inventory — across NPAC, Somos, and TCR — run from a single screen, with an AI assistant built into every view. Stop logging in and out of a dozen systems and reconciling by hand.
TNIQ by Ringer product tour
Real product screens. Customer data replaced with demo data.
The problem
Your numbers live in a dozen systems — and a hundred spreadsheets.
Every operator knows the routine: log into NPAC, then Somos, then TCR, then a Telique lookup, then back to a spreadsheet to reconcile what each one says. Tabs everywhere. No single source of truth. Mistakes that cost real money.
No single source of truth. Just tabs, exports, and copy-paste.
The platform
TNIQ is the one place that runs all of it.
TNIQ connects every system you depend on into one command center — so your team works in a single screen and TNIQ keeps the systems of record in sync underneath.
Ringer Assistant
An AI telecom expert, built into every screen.
Ask in plain English. The Ringer Assistant looks up numbers, SPID, LRN, and CNAM, explains port conflicts, searches your inventory, and even renders the right form to get the job done — grounded in your live data, and always proposing before it acts.
- Look up numbers, SPID, LRN, and CNAM in seconds
- Diagnose port conflicts and failures — then resolve them
- Generate the right form or action on request
- Grounded in your live data: propose, confirm, execute
TNIQ MCP
Bring TNIQ into your own AI assistant.
TNIQ ships an open MCP server — so Claude, Cursor, Copilot, Codex, or ChatGPT can run your number operations directly. Look up numbers, check port status, manage toll-free and messaging, and update CNAM, all through the same secure, per-customer-scoped API.
- Port status, SPID, LRN & CNAM lookups
- Create & track port projects
- Toll-free, messaging & inventory operations
Works with
✓ Detected: Claude, Cursor
✓ Registered 127 TNIQ tools
→ Set TNIQ_API_TOKEN in your config
Secured per-customer · scoped to your API token · v1.0.5
Capabilities
Everything you do with numbers — in one place.
Five workstreams. One screen. No more tab-switching between a dozen portals.
Number porting
Port in and out without the spreadsheet shuffle.
Bulk port-in projects and port-out releases driven straight against NPAC — validation, FOC, activation, conflict resolution — all tracked in one place.
Local / DID inventory
Know exactly what you own, where, and what it’s doing.
Search, reserve, assign, and release DIDs across your estate, with rate-center and LATA inventory maps that turn a spreadsheet into a picture.
Toll-free
Run toll-free the way Somos actually works.
RespOrg management, template editing, pointer records, reservations, and ROC workflows — sourced from Somos as the system of record, not a stale cache.
Messaging / 10DLC
Brand and campaign registration without the TCR maze.
NNID and TCR brand & campaign registration with live MNO status, so you can get numbers messaging-enabled and keep them compliant.
Audits & reconciliation
Catch drift before it becomes an outage.
TNIQ continuously verifies your records against the systems of record (NPAC, Somos), surfaces conflicts, and keeps a full audit trail — so you trust what the screen tells you.
The whole platform
One platform. Every system of record.
TNIQ doesn’t wrap one API — it operates every authority your numbers touch. Here’s a fraction of what your team can do from a single screen (and the same secure API).
Number Porting
6- Bulk port-in projects — validation, FOC, activationNPAC
- IntraSP transfer (LRN change, same SPID)NPAC
- Port-out release & approvalNPAC
- Port conflict create & resolveNPAC
- LRN create & managementNPAC / LSMS
- Port protection rulesTNIQ
Toll-Free
4- RespOrg change (ROC) — LOA, HDI escalationSomos
- CPR template & pointer-record managementSomos
- Search, reserve & activate toll-free numbersSomos
- Toll-free inventory reconcile & syncSomos + RouteLink
Number Inventory
5- DID & TFN query, reserve, assign, releaseTNIQ
- Rate-center & LATA inventory mapsLERG
- Audits & drift reconciliationNPAC / Somos
- NRUF & inventory reportsTNIQ
- Number intelligence — LRN, SPID, CNAM, LERGTelique
Messaging / 10DLC
4- SMS brand creation & managementTCR
- Campaign registration & MNO statusTCR
- CNP electionTCR
- SMS number enablementNNID / nnSR
Caller ID
1- Real-time CNAM (Caller ID) managementTransUnion LIDB
Platform & Access
3- Fine-grained, per-customer API tokensTNIQ
- MCP server — use TNIQ from your AI assistantTNIQ
- In-app AI assistant (Ringer Assistant)TNIQ
Every operation is available via the TNIQ REST API — fine-grained, per-customer-scoped, and token-authenticated.
How it works
The systems of record stay canonical. TNIQ keeps you in sync.
TNIQ never guesses. It queries NPAC, Somos, and the registries as the source of truth, caches for speed, auto-verifies on access, and flags conflicts for resolution — with every change written to an audit trail.
Query the source
TNIQ reads live from NPAC / Somos / registries on access.
Cache & verify
Results are cached for speed and re-verified automatically.
Detect drift
Conflicts are surfaced and flagged for resolution, not hidden.
Audit everything
Every action is recorded for a complete, trustworthy trail.
Why TNIQ
Built by telecom operators, for telecom operators.
One login, not twelve
Everything your team touches all day, behind a single sign-on.
Real-time, not stale
Live NPAC and Somos data — decisions on truth, not yesterday’s export.
Fewer costly mistakes
Validation and reconciliation built in, so errors get caught early.
The whole number lifecycle
Port, assign, register, audit, retire — in one continuous workflow.
See TNIQ run your numbers.
Book a 30-minute walkthrough. We’ll show you your own workflows in one screen.
- No obligation
- Walkthrough tailored to your operation
- Talk to people who run telecom, not a call center